Before
Forced air
Heats the roof first
The problem
Hot air rises. In a warehouse with 20 ft ceilings, unit heaters and forced air warm the roof first, and you pay for every degree up there. Meanwhile your team works in the cold at floor level and the heating runs all day.
How it works
Step 01
Warm water flows through slim ceiling panels, fed by a heat pump or boiler from 95°F.
Step 02
The panels radiate heat downward — like sunshine on a cold, clear day.
Step 03
Floors, equipment and people warm up evenly. No drafts and no cold zones far from the heaters.
Who it's for
Warm working zones without heating the whole air volume.
Warm at floor level, and no dust blown onto fresh paint.
Even heat across the shop floor, no hot spots near heaters.
Silent heating and cooling built into the ceiling, with lighting and ventilation integrated.